Home / Projects / MetroBuild Corridor

Infrastructure Development Land Survey

Ridgeway Civil Group · $16,800 · Eleven-mile utility corridor

Project Overview

Eleven Miles of Control, One Datum

Ridgeway Civil Group needed survey control and terrain data for eleven miles of planned utility infrastructure crossing rolling hills, two creeks and a patchwork of farm parcels.

We established a single GNSS control backbone, mapped the corridor with combined ground and aerial methods, and delivered one seamless terrain model their designers could route through without datum breaks.

Surveyor holding a GNSS pole and field controller
Challenge

Hills, Creeks and Forty Landowners

Steep wooded slopes blocked satellite signals in the valleys, and access had to be negotiated parcel by parcel across forty ownerships — with a design milestone fixed six weeks out.

Approach & Solution

Control First, Then Everything Else

Ridgetop GNSS pairs bridged the dead zones, ground crews leapfrogged ahead of access permissions, and aerial mapping filled the interiors — the full model delivered four days before the milestone.

Project Gallery

From the Field

Drone view of a large construction site
Two workers on a graded construction lot
Client Name

Ridgeway Civil Group

Budget

$16,800

Service

Corridor & Topo

Delivered

4 days early

Related Work

Planning linear infrastructure?

One datum, full corridor, delivered before your design milestone.

Start Your Project